During construction
Planning stage
• Prepare a construction
to identify key waste types and waste reduction targets
• Select materials that can be reused in the event of alterations to minimise wastage or disposal (e.g. recycle wall blocks)
Construction stage
• Sort wastes for reuse and recycle
Figure 122 Sorted broken concrete
(Source: Civil Engineering & Development Department)
• Use precast building components, such as
façades, staircases, semi-precast flooring,
mid-landings, slabs and beams, as much as
possible
Figure 123 Precast
staircases
(Source: Hong Kong
Housing Authority)
Figure 124 Precast building envelope
(Source: Hong Kong Housing
Authority)
• Reuse excavated spoils or inert waste for backfilling, slope stabilisation and reclamation
• Reuse used timber for formwork where applicable
• Dispose of inert construction waste at public fill banks
• Order the right amount of building materials to be delivered at right time to avoid unnecessary cost
During major renovation and retrofitting of
interior fitting-out
Planning stage
• Select materials that can be reused in the event of alteration to minimise wastage or disposal (e.g. recycle wall blocks)
Construction stage
• Sort waste for reuse and recycling
• Avoid the accumulation of renovation waste by requiring its removal once it is
generated and, if possible, assign a dedicated area for its temporary storage
while awaiting removal
• Use covered wheeled bins and trolleys for temporary storage and transportation
Figure 125 Use of wheeled bins for
temporary storage
(Source: Environmental Protection
Department)
6
During renovation or interior decoration
6.1
Demolition and construction waste management